Initial Excavation and Base Layering

0:07
12:52
19.7K views

At 0:07 in

This is going to sound crazy.... 4K

What happens here

The video opens with a time-lapse showing the initial stages of constructing a retaining wall. This includes excavation of the hillside, laying the first course of segmental retaining wall blocks, adding backfill material (likely gravel), and placing layers of geogrid. Heavy machinery like a Kubota SVL 75-2 compact track loader and a Daewoo 75V excavator are utilized for earthmoving. Manual labor is also heavily involved in setting blocks and raking material.

Goal: Establish the foundational layers of the retaining wall and prepare the site.

Tools and materials

  • Daewoo 75V Excavator Daewoo — Excavating the hillside and moving large amounts of earth
  • Geogrid — Reinforcing the soil behind the wall to provide structural stability and resist lateral pressures
  • Rakes — Spreading and leveling backfill material
  • Segmental Retaining Wall Blocks — Constructing the face of the retaining wall
  • Shovels — Manual excavation, moving gravel, and fine-tuning placement
  • Gravel — Backfilling behind the wall for drainage and stability