Skip to main content

Post-Operation Site Assessment and Equipment Final Check

20:09
22:32
341.2K views

At 20:09 in

Thieves Hit right before we Snowplow!

What happens here

Following continuous night plowing, the team inspects the parking lot in daylight. Despite thorough plowing, the pavement remains wet and icy due to the initial rain and above-freezing temperatures during the snowfall. The crew notes the persistence of slick spots, highlighting the challenges of achieving completely clear surfaces in such conditions. Equipment is parked, and operators prepare to hand over to new shifts or conclude their work, emphasizing the ongoing nature of winter maintenance and the need for continuous vigilance.

Goal: After a long night of plowing, the team assesses the cleared parking lot, noting the wet and icy conditions, and prepares the equipment for future operations.

What they say

Hide

[Music] this actually would have been pretty funny i know all right i got the asv key i need the sledge key and i think we're done for the we're not done and we're gonna let you guys go by your merry way and we're gonna go do our thing [Applause] i want to find out what sam thinks of that manito i think we need to do a video just on that machine i think he figured out where the two-speed is i bet this sucked tonight i did the beginning yeah it was slick and then it and then it wasn't so bad nothing broke huh [Laughter] don't speak that evil language he will not say voldemort right the name that cannot be spoken we got some new stuff coming down the pipeline guys we're thoroughly going to test out that manito

Auto-generated from the video audio.