Laying the Initial Foundation and Base Course
At 0:07 in
The worst Contractor of the year award. 4K
What happens here
Once the trench is excavated and any utilities are addressed, a layer of compacted gravel is laid at the bottom. This granular base provides drainage and a stable, level surface for the first course of blocks. The first course of retaining wall blocks is then meticulously placed on this leveled gravel, ensuring each block is perfectly level both front-to-back and side-to-side. A string line is used to maintain straightness and proper alignment, and a rubber mallet helps seat the blocks firmly. This base course is vital for the stability and longevity of the entire retaining wall.
Goal: A gravel base is laid and compacted in the excavated trench, followed by the careful placement and leveling of the first course of retaining wall blocks, establishing the critical foundation for the entire structure.
Tools and materials
- Compactor/Plate Tamper
- Level
- Rubber Mallet
- String Line
- Gravel
- Retaining Wall Blocks
What they say
(149 characters)Hide
What they say
(149 characters)Auto-generated from the video audio.