Constructing Double Pyramid Steps

8:28
13:51
43.7K views

At 8:28 in

The worst Contractor of the year award. 4K

What happens here

Continue laying subsequent courses of Versa-Lok blocks, building upwards and outwards to form the steps. The 'double pyramid' method involves creating a stepped profile on both sides of the central staircase, with each block course set back slightly from the one below it. After laying each course of blocks, backfill the area behind the wall and steps with gravel to provide drainage and structural support. Use levels to ensure each step is even and consistent in height. Periodically compact the gravel backfill using a hand tamper or mechanical compactor.

Goal: The integrated steps are built using the 'double pyramid' technique, stacking Versa-Lok blocks in a staggered pattern to form risers and treads, with gravel backfill for stability.

Tools and materials

  • Bobcat
  • Gravel
  • Hand Tamper or Mechanical Compactor
  • Measuring Tape
  • Rubber Mallet
  • Shovels
  • Spirit Level
  • Versa-Lok Blocks

What they say

Hide

the contractor that hired us to build the retaining wall at that car dealership for seven years would call me up and threaten to sue me and the conversation with him would go something like this hey you built a faulty retaining wall out at the car dealership and I would say no actually the retaining wall was in perfect shape when I left it and you put a dual drum asphalt roller on the top of my retaining wall and pushed it out and then you added more block onto my retaining wall and then you added on to the end of my retaining wall and all of these things were never engineered into the original design of the retaining wall if I'd known that you were going to do all of these things we would have changed and modified the design before we ever started and that's the way the conversation would end and then eventually he finally stopped calling me after seven years foreign [Music]

Auto-generated from the video audio.