Installing the Base Course

6:24
13:51
43.7K views

At 6:24 in

The worst Contractor of the year award. 4K

What happens here

After completing the necessary excavation, spread a layer of gravel to serve as the base for the retaining wall. Compact the gravel thoroughly to create a stable and well-drained foundation. Carefully place the first course of Versa-Lok blocks directly on the compacted gravel. Use a spirit level to ensure each block is perfectly horizontal and aligned. Adjust blocks as needed with a rubber mallet. A string line can be used to maintain a straight alignment for the entire course.

Goal: A stable foundation is prepared with gravel, and the initial layer of Versa-Lok blocks is meticulously laid and leveled to establish a solid base for the entire structure.

Tools and materials

  • Compaction Plate
  • Gravel
  • Rubber Mallet
  • Shovels
  • Spirit Level
  • String Line
  • Versa-Lok Blocks

What they say

Hide

[Music] so it wasn't the fact that the wall was built vertically that was the issue the issue came up with it when the contractor that hired us decided that they were going to add on to the top of