Constructing the Retaining Wall and Integrated Steps
At 0:08 in
The worst Contractor of the year award. 4K
What happens here
Following the base course, additional layers of retaining wall blocks are stacked. Each course is carefully leveled and aligned using a string line and level. The 'double pyramid' method is employed for the steps, where blocks are stacked in a way that creates a set of stairs directly within the retaining wall structure. This involves precisely cut blocks for risers and treads, often with a slight setback for each step. Geogrid reinforcement is also typically integrated between courses to enhance stability, although not explicitly shown in detail. Workers use levels to ensure each block and step is horizontally and vertically correct. The process includes careful planning for corners and transitions to create a seamless and strong structure.
Goal: Subsequent courses of retaining wall blocks are stacked, leveled, and interlocked to form the main wall and the integrated 'double pyramid' steps, with careful attention to alignment and structural integrity.
Tools and materials
- Level
- Rubber Mallet
- String Line
- Tape Measure
- Geogrid
- Retaining Wall Blocks
What they say
(149 characters)Hide
What they say
(149 characters)Auto-generated from the video audio.