Laying First Course of Firepit Seat Wall
At 2:29 in
The Ugliest retaining wall we've ever built -in 4k!
What happens here
While the other crew members work on the main retaining wall base, Blaine initiates the construction of the firepit seat wall. He starts by carefully laying out the first course of retaining wall blocks. Using a measuring tape, he establishes the desired radius for the curved firepit. Each block is meticulously positioned on the prepared Class 5 base. To ensure precise alignment and level, Blaine utilizes a level, a speed square, and a mason's line. Due to the extremely hard and unforgiving nature of the compacted Class 5 base, considerable effort is required to adjust each block, often involving tapping them into place with a rubber mallet. This step requires patience and precision to create a stable and correctly aligned foundation for the firepit seat wall.
Goal: Concurrently with the main retaining wall base adjustments, Blaine begins the intricate process of laying out and leveling the first course of blocks for the curved firepit seat wall, ensuring proper radius and alignment.
Tools and materials
- Level
- Mason's Line/String Line
- Measuring Tape
- Retaining Wall Blocks
- Rubber Mallet
- Speed Square
What they say
(734 characters)Hide
What they say
(734 characters)Auto-generated from the video audio.