Adjusting Upper Retaining Wall Terrace
At 3:09 in
The Ugliest retaining wall we've ever built -in 4k!
What happens here
The team turns its attention to the second terrace of the main retaining wall, which was also started by the previous contractor. It is observed that this section of the wall is built at an incorrect elevation and, more critically, has a soft spot in its Class 5 base. This soft spot is a significant issue, as it would inevitably lead to shifting and settling of the blocks over time. Sam and Blaine work carefully to remove the existing blocks from this problematic section. They then manually dig and adjust the sub-base, striving to eliminate the soft spot and achieve a uniformly stable foundation. Levels and hammers are continuously used to ensure that the newly placed blocks, though temporarily installed for adjustment, are perfectly aligned and at the correct height, mitigating future structural issues.
Goal: The second terrace of the main retaining wall, also partially built by the previous contractor, required extensive adjustments. The existing blocks were at an incorrect elevation and sat on a soft spot in the compacted base, necessitating removal and meticulous re-leveling.
Tools and materials
- Hammer
- Level
- Shovel
- Class 5 Aggregate
What they say
(533 characters)Hide
What they say
(533 characters)Auto-generated from the video audio.