Skip to main content

Initial Site Grading and Compaction

0:00
25:57
39.3K views

At 0:00 in

The CITY left one BIG Mess!

What happens here

Operate a Kubota SVL 75-2 compact track loader to push and spread existing loose soil, performing initial rough grading of the site. Following the loader, a worker will use a Wacker Neuson BS60-4 vibratory plate compactor to compact the freshly graded soil. This action helps to settle the earth, reduce voids, and create a firm, even surface. The process involves multiple passes with the compactor over the entire area to achieve consistent density.

Goal: Begin by using a compact track loader to move and level loose soil across the work area. Subsequently, a worker operates a vibratory plate compactor to ensure the ground is evenly settled and prepared for further construction, establishing a stable foundation.

Tools and materials

  • Kubota SVL 75-2 Compact Track Loader