Skip to main content

Excavation and Placement for Dry Creek Bed

7:30
25:57
39.3K views

At 7:30 in

The CITY left one BIG Mess!

What happens here

The Daewoo 75V excavator, still using its grapple attachment, meticulously digs and refines the trench for the dry creek bed, ensuring the correct depth and width. It then places an array of medium-sized boulders and smaller river stones along the bed and banks of the newly formed channel. Ground personnel may assist in guiding the placement of these stones to create a natural and effective water flow path. This construction diverts stormwater runoff away from the residential property and prevents future erosion, providing both functionality and visual appeal.

Goal: The excavator digs out the final shape of the dry creek bed and precisely places additional boulders and smaller stones to line the channel, creating a functional and aesthetic stormwater drainage solution.

Tools and materials

  • CMP Attachments Grapple
  • Daewoo 75V Excavator
  • Hand Rake
  • Shovel
  • River Stones/Boulders Natural stone