A layer of gravel is spread evenly along the bottom of the excavated trench. This gravel is then thoroughly compacted using a plate compactor to create a solid, level sub-base for the retaining wall blocks. Once the sub-base is ready, the first course of retaining wall blocks is carefully placed. Each block is leveled using a spirit level and adjusted with a hammer to ensure perfect alignment and a stable starting point for the wall.

Tools and materials

  • Measuring Tape
  • Plate Compactor
  • Rubber Mallet/Hammer
  • Shovels and Rakes
  • Skid Steer (ASV VT-70)
  • Spirit Level (long)
  • Gravel Unspecified
  • Retaining Wall Blocks Unspecified