Finalizing Wall Section and Site Clean-up
At 10:00 in
Thats a problem
What happens here
The team continues to extend the retaining wall, working on a curved section. This involves careful excavation to prepare the curved base, placing blocks precisely to follow the curve, and integrating the necessary geotextile layers. Soil is backfilled behind the wall and compacted, with workers using shovels and rakes to grade the surface. The day concludes with the site secured and equipment parked, having made significant progress on the retaining wall's structure and backfill.
Goal: The work progresses to completing the current section of the retaining wall. This involves additional excavation, leveling, block placement, and thorough backfilling to achieve the desired height and contour before concluding for the day.
Tools and materials
- Geotextile Fabric/Grid
- Levels and Measuring Tape
- Mini Excavator
- Plate Compactor
- Retaining Wall Blocks
- Shovels and Rakes
- Skid Steer (Compact Track Loader)
- Gravel
- Soil/Dirt