Continuing Wall Construction and Geotextile Placement

2:10
15:38
13.4K views

At 2:10 in

Thats a problem

What happens here

Once clearance is received for the utility, construction of the wall resumes. Additional courses of retaining wall blocks are laid, followed by the placement of black geotextile fabric. This fabric is crucial for soil stabilization and distributing pressure behind the wall. Gravel is then backfilled behind the blocks and fabric, and a plate compactor is used to ensure proper density. The process of laying blocks, fabric, and backfilling is repeated for each subsequent course of the wall.

Goal: With utility issues addressed, the team continues to build layers of the retaining wall, incorporating geotextile fabric between courses for added stability and reinforcement, and backfilling with gravel and compacted soil.

Tools and materials

  • Geotextile Fabric/Grid
  • Levels and Measuring Tools
  • Plate Compactor
  • Retaining Wall Blocks
  • Shovels and Rakes
  • Skid Steer (Compact Track Loader)
  • Gravel

What they say

Hide

trench and then then we hit this this not knowing it was here so now we got to wait for the maintenance guy to come out and tell us if it's alive or dead and then we can keep [Music] going the biggest mistake I see contractors making is this mind frame that I'm going to let my work speak for me no let you speak for you learn to negotiate instead of diving into your craft which is what you probably want to do take a portion of that time and learn how to negotiate so that you can speak fluently and elegantly and easily with your customers let them know the value that you bring don't just show it in your work because a lot of times your work is like Bread and Wine and let me