Initial Site Preparation and Excavation
0:03
15:38
13.4K views
At 0:03 in
Thats a problem
What happens here
The crew begins by preparing the site, which includes rough clearing of the area where the retaining wall will be constructed. An excavator is then used to dig a deep and wide trench along the planned path of the wall. This trench will serve as the foundation for the retaining wall, requiring precision to ensure proper depth and alignment for stability.
Tools and materials
- Excavator
- Measuring Tape
- Shovels
- Skid Steer (ASV VT-70)
What they say