Lay the First Tier of Timbers and Rough Leveling
0:09
34:32
6.5K views
At 0:09 in
Teaching a Laborer TO THINK like a LEADER #2
What happens here
Begin by laying out the first tier of heavy timber logs for the base of the stairs. Use a measuring tape to ensure consistent dimensions. Once positioned, use a spirit level to check the horizontal alignment of each log and the overall tier. Secure the timbers to the ground using a power drill to drive large timber screws or rebar through the logs and into the earth. The initial tier must be level and firmly anchored as it forms the foundation for the entire staircase.
Goal: Establish a level and secure base for the stairs.
Tools and materials
- Heavy Timber Logs — Constructing the steps
- Measuring Tape — Ensuring consistent dimensions and spacing
- Power Drill DeWalt — Drilling holes for and driving large timber screws
- Spirit Level Milwaukee — Checking the horizontal and vertical alignment of the timbers
- Timber Screws — Securing the timber logs
What they say
(478 characters)Hide
What they say
(478 characters)Auto-generated from the video audio.