Skip to main content

Lay the First Tier of Timbers and Rough Leveling

0:09
34:32
6.5K views

At 0:09 in

Teaching a Laborer TO THINK like a LEADER #2

What happens here

Begin by laying out the first tier of heavy timber logs for the base of the stairs. Use a measuring tape to ensure consistent dimensions. Once positioned, use a spirit level to check the horizontal alignment of each log and the overall tier. Secure the timbers to the ground using a power drill to drive large timber screws or rebar through the logs and into the earth. The initial tier must be level and firmly anchored as it forms the foundation for the entire staircase.

Goal: Establish a level and secure base for the stairs.

Tools and materials

  • Heavy Timber Logs — Constructing the steps
  • Measuring Tape — Ensuring consistent dimensions and spacing
  • Power Drill DeWalt — Drilling holes for and driving large timber screws
  • Spirit Level Milwaukee — Checking the horizontal and vertical alignment of the timbers
  • Timber Screws — Securing the timber logs

What they say

Hide

so in today's video we're going to be teaching zach how to install a set of steps on his own and learning those set of steps is only part of what we're really trying to teach zach and that's to become an independent thinker to make a mistake to learn from his mistake and then to move on from his mistake so we're going to be letting zack screw up and then trying to course correct him without trying to hurt his feelings so let's just dive right into today's video side [Music]

Auto-generated from the video audio.