Install and Level the Sixth and Seventh Tiers
15:45
34:32
6.5K views
At 15:45 in
Teaching a Laborer TO THINK like a LEADER #2
What happens here
For the final tiers (sixth and seventh), continue the process of carefully placing, leveling, and securing each timber log. Pay close attention to the top landing to ensure it is perfectly flat and seamlessly transitions to the surrounding ground or patio. Drive in all necessary timber screws and make any final adjustments to the position of the logs. The completed steps should be solid, level, and aesthetically pleasing.
Goal: Complete the final tiers of the stairs, ensuring a level top landing and overall structural integrity.
Tools and materials
- Heavy Timber Logs — Constructing the steps
- Power Drill DeWalt — Drilling holes for and driving large timber screws
- Spirit Level Milwaukee — Checking the horizontal and vertical alignment of the timbers
- Timber Screws — Securing the timber logs