Install and Level the Third Tier
7:30
34:32
6.5K views
At 7:30 in
Teaching a Laborer TO THINK like a LEADER #2
What happens here
Place the timber logs for the third tier. Carefully check the level of each log using a spirit level, ensuring horizontal and vertical alignment with the existing stairs. Secure the timbers using the power drill to drive in timber screws. Continue to backfill with soil where necessary, tamping it down to maintain stability. The goal is to build upon the previous tiers with consistent height and depth for each step.
Goal: Construct the third tier of stairs, maintaining levelness and stability.
Tools and materials
- Heavy Timber Logs — Constructing the steps
- Power Drill DeWalt — Drilling holes for and driving large timber screws
- Shovel — Backfilling with soil
- Spirit Level Milwaukee — Checking the horizontal and vertical alignment of the timbers
- Timber Screws — Securing the timber logs
- Soil Local soil — Backfilling and stabilizing timbers
What they say
(1,258 characters)Hide
What they say
(1,258 characters)Auto-generated from the video audio.