Skip to main content

Install and Level the Fourth Tier

10:50
34:32
6.5K views

At 10:50 in

Teaching a Laborer TO THINK like a LEADER #2

What happens here

Continue building the staircase by placing the timber logs for the fourth tier. As with previous steps, ensure each log is perfectly level both horizontally and vertically using a spirit level. Securely fasten the timbers to the lower tiers and the ground using the power drill and timber screws. Address any fitting issues or gaps by adjusting the surrounding soil or making minor cuts to the timber. The goal is to maintain a consistent rise and run for comfortable and safe climbing.

Goal: Build and secure the fourth tier of the staircase, ensuring proper alignment and stability.

Tools and materials

  • Heavy Timber Logs — Constructing the steps
  • Power Drill DeWalt — Drilling holes for and driving large timber screws
  • Shovel — Adjusting soil around timbers
  • Spirit Level Milwaukee — Checking the horizontal and vertical alignment of the timbers
  • Timber Screws — Securing the timber logs

What they say

Hide

now to me i've always firmly believed that there's more than one right way to accomplish anything meaning that i may have one way that i want something done that doesn't mean it's the only way for it to get done and to be done right now in this case the guys have a root that's in the way of letting that timber get in place they have two options they could cut that route or they could cut the timber they opted to cut the timber so that the tree would stay unharmed either way works with

Auto-generated from the video audio.