Skip to main content

Positioning the First Manufactured Home Section

0:00
13:26
18.5K views

At 0:00 in

Stuck in the MUD Pulling a HOUSE up a hill 4K

What happens here

The initial step involves maneuvering the first section of the manufactured home. A Platypus tracked dolly, also known as a CST Platypus, is used to pull the heavy section, while a Case 570L XT backhoe provides additional pushing power from the front. This delicate operation requires careful coordination due to limited clearance around trees and uneven terrain. Ensure the path is cleared as much as possible to avoid obstructions.

Goal: Move the first section of the manufactured home to its general placement area

Tools and materials

  • Backhoe Loader Case 570L XT — Pushing the manufactured home section and providing additional motive force
  • Platypus Tracked Dolly CST Platypus — Pulling the manufactured home section across the terrain
  • Safety Vests — Ensuring visibility of ground crew for heavy equipment operators
  • Tow Chains/Straps — Connecting the home section to the Platypus and backhoe