Final Placement of the First Section
2:49
13:26
18.5K views
At 2:49 in
Stuck in the MUD Pulling a HOUSE up a hill 4K
What happens here
After the initial placement, the backhoe is repositioned to precisely nudge the first section of the manufactured home onto the concrete foundation pad. This involves small, controlled movements to ensure accurate alignment with the intended final position. The ground crew guides the operator, ensuring it lands squarely on the prepared pad.
Goal: Accurately align the first section onto the concrete foundation
Tools and materials
- Backhoe Loader Case 570L XT — Making fine adjustments to position the home section
- Concrete Foundation Pad — The permanent base for the manufactured home