What happens here
With both sections near the foundation, the second module is meticulously moved into its final position alongside the first. The backhoe is used for precise adjustments, pushing the module laterally and forward until it's perfectly aligned with the first section on the concrete pad. This step requires close communication and careful observation to ensure a seamless fit.
Goal: Achieve perfect alignment of the second section with the first on the foundation
Tools and materials
- Backhoe Loader Case 570L XT — Making precise adjustments for final alignment
- Platypus Tracked Dolly CST Platypus — May be used for initial pushes before fine-tuning with the backhoe