Skip to main content

Mount the Meter Pan to the Building

0:17
1:16
78.3K views

At 0:17 in

Service Call, Customer has a Strained Meter Socket, Dad Teaches Son how to repair, Thoughts?

What happens here

The meter pan, which houses the electric meter, needs to be securely mounted to the exterior wall of the building. The apprentice uses a level, specifically a Klein Tools level, to ensure the meter pan is perfectly straight and plumb. Once aligned, an impact driver is used to drive screws or fasteners through the mounting holes in the meter pan and into the building's siding, securing it in place.

Goal: Securely attach the meter pan in a level position on the building's exterior.

Tools and materials

  • Impact Driver/Drill Milwaukee — Driving screws to secure the meter pan
  • Level Klein Tools — Ensuring the meter pan is horizontally and vertically aligned
  • Meter Pan — The enclosure for the electric meter
  • Screws/Fasteners — Securing the meter pan to the building

What they say

Hide

let's take that tape off. Okay. Let's clean up the top of that. The lock ring on. You're going to mount the meter pan, and then we're going to work on the SEU. Get down on your knees. I got it. Get the level on. I'll get this done. I'll get this done. I know you will. Right there. Learning how to use that tool good. Very good. Nice job. Tighten more? Uh no, then tighten the top. A lot of new guys will just over-tighten it, and that's not

Auto-generated from the video audio.