Site Preparation and Initial Grading
1:10
21:11
106.7K views
At 1:10 in
Retaining Walls - Master Series- steps 1-4
What happens here
The project begins with a general overview of the site, which is a sloped area next to a residential building where a previous homeowner had started a retaining wall project but abandoned it. The first crucial step is to prepare the work area by clearing loose debris, grading the terrain to expose virgin soil, and establishing a safe and efficient workspace for heavy machinery and manual labor. A Kubota SVL 65-2 skid steer is used to move existing dirt and roughly level the ground.
Goal: Prepare the sloped work area by clearing debris and roughly grading to expose virgin soil, creating a safe workspace.
Tools and materials
- Kubota SVL 65-2 Skid Steer Kubota — Moving dirt, clearing debris, and initial grading of the work area
What they say
(810 characters)Hide
What they say
(810 characters)Auto-generated from the video audio.