Skip to main content

Site Preparation and Initial Grading

1:10
21:11
106.7K views

At 1:10 in

Retaining Walls - Master Series- steps 1-4

What happens here

The project begins with a general overview of the site, which is a sloped area next to a residential building where a previous homeowner had started a retaining wall project but abandoned it. The first crucial step is to prepare the work area by clearing loose debris, grading the terrain to expose virgin soil, and establishing a safe and efficient workspace for heavy machinery and manual labor. A Kubota SVL 65-2 skid steer is used to move existing dirt and roughly level the ground.

Goal: Prepare the sloped work area by clearing debris and roughly grading to expose virgin soil, creating a safe workspace.

Tools and materials

  • Kubota SVL 65-2 Skid Steer Kubota — Moving dirt, clearing debris, and initial grading of the work area

What they say

Hide

so let's jump into it all right so here's the plan we need to get this dirt somewhere we need to get down to virgin soil so we're going to focus today on making ourselves a nice work space we're going to get these blocks all moved out of the way we're gonna get our elevations set along here and all that fun stuff so the homeowner here this guy real nice guy super chill uh gave us the heads up that this neighbor right over here is a real piece of work and you guys aren't going to be able to see it on this camera because i can't zoom it in tight enough but she's out here putting cameras up facing us she's got one right there next to the grill there's one she's got just put up right there on top of the meter facing us she just went inside and i'll bet you it was to grab more cameras what the hell goofy

Auto-generated from the video audio.