Laying the First Course of Blocks
At 15:40 in
Retaining Walls - Master Series- steps 1-4
What happens here
The first course of Versa-Lok Standard retaining wall blocks is meticulously laid on the compacted gravel base. These blocks are solid concrete units, which are preferred over hollow blocks due to their increased weight and stability. The Versa-Lok system utilizes pins that are driven through the top block into the block below, creating a strong mechanical connection that prevents shifting, especially in freeze-thaw cycles. Each block is carefully positioned and leveled by hand, and the Bobcat 325 mini excavator is used to efficiently place the blocks into the trench.
Goal: Install the initial layer of retaining wall blocks with precision and secure mechanical connections.
Tools and materials
- Bobcat 325 Mini Excavator Bobcat — Assisting in the precise placement of retaining wall blocks into the trench
- Hammer — Driving pins through blocks for connection
- Level — Ensuring blocks are perfectly level and flat
- Pins — Connecting individual retaining wall blocks securely
What they say
(2,500 characters)Hide
What they say
(2,500 characters)Auto-generated from the video audio.