Implementing Bridging Soil Correction with Riprap
0:54
14:48
15.4K views
At 0:54 in
Retaining wall BASE failure
What happens here
Given the soil conditions, the team decides on a bridging soil correction. They plan to use approximately 1 foot of 3-inch riprap rock as the base, followed by 6 inches of 3/4-inch aggregate. The team begins hand-digging the problematic section because using the mini excavator (Bobcat 331) in this area could cause the existing bank to collapse, posing a safety risk. This small section, about 4-5 feet wide, is particularly critical due to poor drainage and downspout runoff from the house that has turned the soil into 'soup' over the years.
Goal: Stabilize the unstable soil using bridging soil correction with specified rock layers.
Tools and materials
- Aggregate — Layered above the riprap for further stability
- Excavator Bobcat 331 — Used for other parts of the site but avoided in this unstable section
- Riprap — Creating a stable base layer for bridging soil correction
- Shovels — Manual excavation of soil