Secure Door Opening and Set Up Workstation
At 1:34 in
Refinishing A Front Door. Clear Coating A Door With Urethane.
What happens here
After removing the door, immediately cover the open doorway with plastic sheeting. This helps to keep the interior climate controlled (preventing heat or cool air loss) and keeps bugs, dust, and other airborne debris from entering the home. In an outdoor area, set up a stable workstation by placing two 5-gallon buckets (or similar stable supports) on a level surface. Place cardboard shields on top of the buckets to prevent any scratches or damage to the underside of the door when it's laid flat.
Goal: Cover the door opening to maintain indoor climate control and prevent debris entry, then establish a stable and protected outdoor workstation for the door.
Tools and materials
- 5-gallon buckets
- Cardboard shields
- Exterior door
- Masking tape
- Plastic sheeting
What they say
(601 characters)Hide
What they say
(601 characters)Auto-generated from the video audio.