Demolition and Trench Excavation
At 3:26 in
Rebuilding a Collapsed retaining wall 4K
What happens here
Utilizing a Bobcat E32 mini-excavator, the crew systematically removes the collapsed concrete blocks and debris of the old retaining wall. Concurrently, they excavate a new trench where the base of the retaining wall will be established. Precision is critical during this step; the trench must be dug to a depth of exactly one foot (12 inches) below the final grade. The adjacent sidewalk is used as a reliable reference point for maintaining the correct grade elevation throughout the excavation. It is explicitly warned not to over-excavate, as digging too deep would necessitate backfilling and extra compaction, potentially leading to future settling issues.
Goal: The crew demolishes the remnants of the old retaining wall and excavates a new trench, ensuring it is precisely one foot below the desired final grade for the new wall, using the adjacent sidewalk as a reference.
Tools and materials
- Bobcat E32 Mini-Excavator
- Caution Tape
- Measuring Tape/Ruler
- Shovels
What they say
(839 characters)Hide
What they say
(839 characters)Auto-generated from the video audio.