Backfill with Native Topsoil and Grade
At 9:59 in
Rebuilding a Collapsed retaining wall 4K
What happens here
With the drainage rock in place, the final step involves backfilling the remaining 4 to 6 inches of the trench with native topsoil. This topsoil layer allows for seamless integration of the retaining wall into the existing landscape. The soil is carefully spread and graded to ensure proper water runoff away from the wall and to prepare the area for planting grass, shrubs, or other landscaping elements, meeting the aesthetic and functional needs of the customer. The area is raked to create a smooth, finished appearance.
Goal: The remaining space behind the drainage layer is backfilled with native topsoil, and the area is graded to blend seamlessly with the surrounding landscape, providing a suitable bed for future planting.
Tools and materials
- Kubota SVL75-2 Skid Steer
- Rake
- Shovel
- Native Topsoil Unspecified
What they say
(852 characters)Hide
What they say
(852 characters)Auto-generated from the video audio.