Skip to main content

Backfill with Drainage Rock

8:41
12:39
49.7K views

At 8:41 in

Rebuilding a Collapsed retaining wall 4K

What happens here

Once the retaining wall blocks are installed, a significant amount of 3/4-inch clear angular rock is used to backfill the trench behind the wall. This material serves as a crucial drainage layer, allowing water to pass through freely and preventing the buildup of hydrostatic pressure against the wall, which is a common cause of retaining wall failure. The video re-emphasizes that only 3/4-inch clear angular rock should be used in the drainage zone, not recycled Class 5 material or pea rock, as these alternatives can clog or shift over time, compromising drainage. The rock is carefully placed to fill the space behind the interlocking blocks.

Goal: 3/4-inch clear angular rock is used to backfill behind the installed retaining wall blocks, creating a robust drainage layer that prevents hydrostatic pressure buildup and ensures the wall's long-term stability.

Tools and materials

  • Kubota SVL75-2 Skid Steer
  • Rake
  • Shovel
  • 3/4-inch Clear Angular Rock Unspecified

What they say

Hide

[Applause] [Music] here's a nice close-up view of what the base Rock looks like it is the exact same material that we use for the drainage behind the retaining lock we always prefer three-quarter Clear Rock I said earlier you can use recycle class five and you can't use it in the drainage Zone let's be clear on that we use this rock for both our drainage and our base and it's worked perfectly for 20 plus years and we go heavy on it it's cheap insurance rock is just cheap insurance I'll get this spread around right here we'll see where we're at I'll bet you we could get rid of some more like right in front of where that saw is probably too

Auto-generated from the video audio.