Site Walkthrough and Pipe Identification
3:09
18:55
21.7K views
At 3:09 in
Putting in a BIG CULVERT PIPE!
What happens here
Walk through the work area to visually assess the landscape. Point out a marker for the water system termination point and trace the path of a future trench. Observe a large, 24-inch, heavy-gauge steel pipe (a former gas line pipe) that was originally part of the dam. This pipe will be reused for the wash crossing. The pond's status is briefly mentioned: it was previously leaking but sealed with a product called 'Dam It' and some clay, and is now spring-fed, providing clean water for livestock without direct access for the animals.
Goal: Understand the terrain, identify existing infrastructure, and locate the culvert pipe
Tools and materials
- 24-inch Steel Pipe — Creating the wash crossing under the path