Skip to main content

Assess Dirt Pile and Eroded Gully

3:55
18:55
21.7K views

At 3:55 in

Putting in a BIG CULVERT PIPE!

What happens here

Inspect the areas that need modification. First, examine a large dirt pile containing rocks and various debris that was excavated from the pond. This pile needs to be relocated. Then, identify a severely eroded section near the pond's edge, described as a 'gully wash.' This area, although no longer actively washing out, is uneven and will be filled and leveled using the excavated dirt to create a smooth transition.

Goal: Identify areas requiring earthmoving and leveling.

Tools and materials

  • Dirt — To be excavated and used for filling the eroded area