Skip to main content

Introduction and Project Overview

0:00
18:55
21.7K views

At 0:00 in

Putting in a BIG CULVERT PIPE!

What happens here

The project begins with an introduction to the task of fixing up an eroded area near a pond to create a wash crossing for a future fencing project. The narrator stands next to a Gehl RT210 skid steer loader, highlighting its importance for the heavy work ahead. The area around the pond is visibly rough and eroded, requiring significant earthmoving and preparation.

Goal: Understand the project scope and identify the work area

Tools and materials

  • Gehl RT210 Skid Steer Loader Gehl — Heavy earthmoving and material handling for the project