Skip to main content

Clear Eroded Gully

7:59
18:55
21.7K views

At 7:59 in

Putting in a BIG CULVERT PIPE!

What happens here

Using the Gehl RT210 skid steer, begin clearing the eroded gully area near the pond. Operate the tooth bucket to scrape and push accumulated organic matter, loose soil, and debris, starting from the edges and gradually moving towards the center of the gully. The goal is to prepare a relatively flat base for the culvert pipe and a smooth transition into the pond.

Goal: Remove debris and level the eroded gully for pipe installation

Tools and materials

  • Dirt Dog Tooth Bucket Dirt Dog — Scraping and pushing debris
  • Gehl RT210 Skid Steer Loader Gehl — Operating the tooth bucket to clear the gully