Initial Breaking and Debris Removal
At 0:00 in
Pool Removal GONE WRONG. Breaking up the Pool & popping concrete 4 k video
What happens here
The Daewoo 75V excavator is maneuvered into position within the partially filled pool basin. Using a hydraulic grapple attachment, the operator initiates the concrete removal process by breaking apart existing concrete structures and collecting loose debris. This includes large chunks of asphalt and other materials left behind by a previous contractor. The grapple is used to both break smaller concrete sections and to lift and relocate the debris to a designated pile outside the immediate work area.
Goal: The operator begins by breaking up sections of the concrete pool structure and removing existing miscellaneous debris using a hydraulic grapple attachment on the excavator.
Tools and materials
- Concrete Debris
- Daewoo 75V Excavator
- Hydraulic Grapple CAP Attachments