Establishing Rough Grades and Addressing Muddy Conditions

3:35
22:05
10K views

At 3:35 in

Pond day #5 Mistakes were made

What happens here

The team begins the process of establishing rough grades around the pond. Geotextile fabric is laid down to help with stability and weed suppression. A Kubota mini excavator is used to move and spread initial layers of dirt along the fence line and pond edges. Due to persistent rainfall, the ground is muddy, causing hydraulic pressure issues with the excavator's bucket coupler. This forces a change in plans, necessitating the team to secure more dry dirt from a separate pile before continuing large-scale grading in the immediate pond area.

Goal: Lay geotextile fabric and begin rough grading, adapting to environmental challenges.

Tools and materials

  • Bucket Coupler — Connecting attachments to the excavator
  • Kubota Mini Excavator Kubota — Moving and spreading dirt, initial grading
  • Shovel — Assisting with dirt movement and leveling
  • Dirt/Soil Local soil — Creating new grades around the pond
  • Geotextile Fabric — Ground stabilization and weed barrier

What they say

Hide

with those results right boys change of plans rant is not our friend yeah the rains and the mud for the last days and days is not our friend we're slipping and sliding just getting in so I think we're going to have to build this side up before we can drive in here yeah at least with anything all right so let's uh you can back the car you can back that out save the sand we're going to need that you can just shut that machine off back it out we need to get the boulder settings in here and then we'll build this part of the road up right