Establishing Rough Grades and Addressing Muddy Conditions
3:35
22:05
10K views
At 3:35 in
Pond day #5 Mistakes were made
What happens here
The team begins the process of establishing rough grades around the pond. Geotextile fabric is laid down to help with stability and weed suppression. A Kubota mini excavator is used to move and spread initial layers of dirt along the fence line and pond edges. Due to persistent rainfall, the ground is muddy, causing hydraulic pressure issues with the excavator's bucket coupler. This forces a change in plans, necessitating the team to secure more dry dirt from a separate pile before continuing large-scale grading in the immediate pond area.
Goal: Lay geotextile fabric and begin rough grading, adapting to environmental challenges.
Tools and materials
- Bucket Coupler — Connecting attachments to the excavator
- Kubota Mini Excavator Kubota — Moving and spreading dirt, initial grading
- Shovel — Assisting with dirt movement and leveling
- Dirt/Soil Local soil — Creating new grades around the pond
- Geotextile Fabric — Ground stabilization and weed barrier