Completing Final Dirt Spreading and Leveling
18:02
22:05
10K views
At 18:02 in
Pond day #5 Mistakes were made
What happens here
After placing the large log, the final layers of dry topsoil are spread and meticulously leveled around the pond. The Cast Loaders 33T mini loader is used to distribute the dirt, while Zakk follows with a rake and shovel to ensure a smooth, finished grade. This step aims to complete the immediate grading, creating a clean, level surface that prevents erosion and is ready for the planned plantings and final landscaping touches.
Goal: Achieve a smooth, finished grade around the pond, ready for planting and final landscaping.
Tools and materials
- Rake — Fine-tuning the grade and smoothing the soil
- Shovel — Moving small amounts of dirt and sculpting edges
- Dry Topsoil Local soil — Final top layer for grading and planting
What they say
(1,626 characters)Hide
What they say
(1,626 characters)Auto-generated from the video audio.