Complete Third Room (First Coat) and Second Room (Second Coat)

9:51
14:11
223K views

At 9:51 in

Painting 3 ROOMS IN 3 HOURS. Painting fast and making money. Paint a room in 30 minutes.

What happens here

While the second coat is being applied to the first room, other team members can start the preparation and first coat application for a third room, if applicable, to maintain efficiency. The video indicates a third room (pink room) had its first coat applied during this rotation. After the first room's second coat is complete, return to the second room (purple room) and follow the same steps: caulk trim, perform final cut-ins, and apply the second coat of paint. For highly pigmented colors like purple, a third coat might be necessary to ensure full coverage and hide the original color.

Goal: Continue the rotation by painting the third room and applying the second coat to the second room.

Tools and materials

  • 18-inch Bucket — Holding paint
  • 18-inch Roller with 3/8-inch Nap — Applying paint
  • 3-inch Angle Sash Brushes — Final detail cut-ins
  • Caulk Gun — Applying caulk
  • Caulk — Sealing gaps
  • Extension Pole — Extending the reach of the roller
  • Paint — Additional coats on walls and ceilings

What they say

Hide

[Music] So cruise right along. We almost got this room done as you can see. Show you the ceiling. Got four vinyl cutins over here. Just just got the windows cut in. Greg's finally getting those finished up. But we're going to be moving on to the second room and we're about an hour and 15 minutes into this. We're just pulling masking. There you have it. This was our mint green room here. So, it's now it's 1:30 now. We started at 12:00. We're in our second room and I also working an hour and a half. Got the first room done, this room done, and we uh did our first coat on the third room. So, we're going to try to get this room done here in the next 30 minutes. and have two rooms done in an hour. So, we're just cruising right along. This room is almost done. We're going to move to our third room. We'll be cleaning up, pulling all the masking in here. It's 1:45. We're 15 minutes shy. I think we'll probably have this done within that amount of time. The paint's drying a little bit slower in here. We may have to go back and roll a third coat. I'm looking at it this room cuz it was that vibrant purple. There's some spots that may need an actual third coat. But we're going to It's extremely humid now in here because of all the rolling we've been doing. So, it's going to uh be slow to dry, but we'll see if we can get it done. We're going to crank up the heat even higher to try to get it to dry faster. So, right before doing your second coat of paint, walk around, make sure there's nothing you missed spackling cuz you'll see things that you didn't see before. using a quick dry silk priming spackling and a spackle knife to go around and spackle these holes and then I'm going to roll my second coat. So that's actually 207 now. We've got the first room done. This room I'm doing just uh finalizing the window back there and I'm cleaning it all up and this room is all done. So it's been just a little about 5 minutes over 2 hours now. I'm going to have to come back in here. I think this is going to take uh another really quick coat. It might take, you know, 15 minutes to go over and coat a third coat on these walls because of the purple color. You can see what it used to be on these doors right there. So, probably about 2 and 1/2 hours total to do these two