Final Trenching and Grid Placement
17:26
20:16
56K views
At 17:26 in
our TALL WALL is Plagued with Problems
What happens here
The final segments show the mini-excavator (Bobcat 325) digging a trench adjacent to the newly constructed retaining wall. A worker is seen measuring distances for the placement of the geogrid, ensuring proper overlap and coverage to integrate with future backfill. The presenter provides a final commentary on the entire retaining wall project, reinforcing the importance of proper grid placement and flat installation.
Goal: This step covers the final trenching work alongside the retaining wall and meticulous measurement for the geogrid, emphasizing its crucial role in the wall's long-term stability.
Tools and materials
- Geosynthetic Grid (Geogrid)
- Measuring Tape
- Mini Excavator (Bobcat 325)
What they say
(2,315 characters)Hide
What they say
(2,315 characters)Auto-generated from the video audio.