Constructing the Retaining Wall Base

11:52
20:16
56K views

At 11:52 in

our TALL WALL is Plagued with Problems

What happens here

The retaining wall construction progresses with workers laying concrete blocks, backfilling layers with gravel using a skid steer, and compacting the backfill. A critical technique is demonstrated: laying geosynthetic grid (geogrid) between layers of blocks and extending it into the compacted backfill. The presenter explains that this allows for stacking up to four courses of blocks before needing backfill, and stresses the importance of laying the geogrid completely flat and tensioned to maximize structural integrity and prevent the wall from tipping.

Goal: This step outlines the construction of a retaining wall, focusing on layering concrete blocks, backfilling with gravel, and properly installing geosynthetic grid to ensure stability and allow for efficient stacking.

Tools and materials

  • Concrete Retaining Wall Blocks
  • Geosynthetic Grid (Geogrid)
  • Gravel
  • Measuring Tape
  • Plate Compactor (Wacker)
  • Shovels and Rakes
  • Skid Steer (ASV RT-75 Posi-Track)

What they say

Hide

popped right up it'll be interesting to see if they keep using it i know sam is in love with this husqvarna but we'll see if he keeps using it all right so back to this retaining while we're building you see how they flip that grid up that's an important thing that we can sack these four high and i think sam goes into that a little bit and what we do is we'll pack up to that grid layer lay that grid down and then continue to pack on top of it but that's how you can speed up production so you could we go from laying block to back filling to laying block to backfilling and vice versa yeah remember guys slow smooth smooth as fast um so i gotta cut one for here i gotta cut one for there and then we'll have two more sets of cuts and we'll be caught up with those guys and we can backfill and all that kind of stuff reverse lock says with these blocks that you can go you can stack four courses out of the ground before you need a backfill and that's because if you go much more than that the extra weight will start tipping backwards on it that's not not something that you want to have happen so the reason the extra weight is starts tipping backwards is because the blocks have an automatic setback so if you got a block here the next block if this is the wall going this way it sets back automatically blaine hurt himself hopefully not too bad but he's going to be out for a couple of days and with that being said look at who came crawling out of his cave look at that who's that who's that right there anyways he came crawling out of the cave which is his office coming out so tim took over on the retaining wall project because blaine hurt himself and i took over on the pool demo project because alex hurt himself and it wouldn't make a difference if they hurt themselves or not we still tim and i both still get out on the job because it's a way to keep your skills fresh we don't need to be on those jobs but we also don't need to become complacent and lose our skill set and lose an understanding of what it takes to complete a project [Music] so what we got going on over here is we're going to be stepping up we're going to be stepping up really quick because this is where yeah i mean we're working on a hill and it gets real steep up through here so i'm going to get all this based out step ups in and get caught up to course well joey and tim are over there working on that mess of a corner and getting all the base in and stuff over there so then uh hopefully we can get all the…