Constructing the Retaining Wall Base
At 11:52 in
our TALL WALL is Plagued with Problems
What happens here
The retaining wall construction progresses with workers laying concrete blocks, backfilling layers with gravel using a skid steer, and compacting the backfill. A critical technique is demonstrated: laying geosynthetic grid (geogrid) between layers of blocks and extending it into the compacted backfill. The presenter explains that this allows for stacking up to four courses of blocks before needing backfill, and stresses the importance of laying the geogrid completely flat and tensioned to maximize structural integrity and prevent the wall from tipping.
Goal: This step outlines the construction of a retaining wall, focusing on layering concrete blocks, backfilling with gravel, and properly installing geosynthetic grid to ensure stability and allow for efficient stacking.
Tools and materials
- Concrete Retaining Wall Blocks
- Geosynthetic Grid (Geogrid)
- Gravel
- Measuring Tape
- Plate Compactor (Wacker)
- Shovels and Rakes
- Skid Steer (ASV RT-75 Posi-Track)