Skip to main content

Continuing Retaining Wall Layers and Reinforcement

11:23
20:16
56K views

At 11:23 in

our TALL WALL is Plagued with Problems

What happens here

The retaining wall construction continues, with workers spreading gravel behind the newly laid blocks. The mini-excavator dumps large quantities of gravel, which is then manually spread and compacted. The operator describes the crucial role of the geotextile grid (geogrid) in stabilizing the wall, especially on sloped terrain. He explains that the blocks have an automatic setback feature, which means each successive layer is set back slightly from the one below, creating a natural slope. He emphasizes the importance of stopping and backfilling/compacting every four courses (layers) of blocks to prevent the wall from tipping over due to accumulated weight and instability, especially if the slope is steep.

Goal: Advance the retaining wall construction by adding more courses and reinforcing them.

Tools and materials

  • Concrete Blocks — Building the retaining wall
  • Geotextile Grid — Reinforcing the retaining wall
  • Mini-Excavator Bobcat 325 — Transporting and dumping gravel for backfill
  • Plate Compactor Wacker Neuson — Compacting backfill
  • Rakes — Leveling gravel
  • Shovels — Spreading gravel
  • Gravel — Backfilling the retaining wall

What they say

Hide

okay so about that stock it's been used like twice so that thing's been sitting for almost three years full tank of gas in there dump the gas out new one in or report new stuff in popped right up it'll be interesting to see if they keep using it i know sam is in love with this husqvarna but we'll see if he keeps using it all right so back to this retaining while we're building you see how they flip that grid up that's an important thing that we can sack these four high and i think sam goes into that a little bit and what we do is we'll pack up to that grid layer lay that grid down and then continue to pack on top of it but that's how you can speed up production so you could we go from laying block to back filling to laying block to backfilling and vice versa yeah remember guys slow smooth smooth as fast um so i gotta cut one for here i gotta cut one for there and then we'll have two more sets of cuts and we'll be caught up with those guys and we can backfill and all that kind of stuff reverse lock says with these blocks that you can go you can stack four courses out of the ground before you need a backfill and that's because if you go much more than that the extra weight will start tipping backwards on it that's not not something that you want to have happen so the reason the extra weight is starts tipping backwards is because the blocks have an automatic setback so if you got a block here the next block if this is the wall going this way it sets back automatically blaine hurt himself hopefully not too bad but he's going to be out for a couple of days and with that being said look at who came crawling out of his cave look at that who's that who's that right there anyways he came crawling out of the cave which is his office coming out so tim took over on the retaining wall project because blaine hurt himself and i took over on the pool demo project because alex hurt himself

Auto-generated from the video audio.