Excavating Base for Stepped Retaining Wall
At 13:59 in
our TALL WALL is Plagued with Problems
What happens here
The mini-excavator is working on excavating the base for a new section of the retaining wall, which will involve stepping up the courses due to the steep slope. The speaker indicates that he has taken over on the mini-excavator (because Blaine got injured), and Tim is working on the retaining wall, and Alex is on the pool demo project (because Alex got injured), highlighting the crew's adaptability and commitment to staying involved in hands-on work to maintain skills. He emphasizes the importance of ensuring the geogrid is laid perfectly flat, without any 'washboards' or uneven angles, unless a specific engineered design requires such an angle.
Goal: Prepare the ground for a new, higher section of the retaining wall on a steep incline.
Tools and materials
- Geotextile Grid — Reinforcing the retaining wall
- Measuring Tape — Ensuring correct dimensions and grid placement
- Mini-Excavator Bobcat 325 — Digging the base for the retaining wall
- Shovel — Manual excavation and leveling
What they say
(2,497 characters)Hide
What they say
(2,497 characters)Auto-generated from the video audio.