Skip to main content

Excavating Base for Stepped Retaining Wall

13:59
20:16
56K views

At 13:59 in

our TALL WALL is Plagued with Problems

What happens here

The mini-excavator is working on excavating the base for a new section of the retaining wall, which will involve stepping up the courses due to the steep slope. The speaker indicates that he has taken over on the mini-excavator (because Blaine got injured), and Tim is working on the retaining wall, and Alex is on the pool demo project (because Alex got injured), highlighting the crew's adaptability and commitment to staying involved in hands-on work to maintain skills. He emphasizes the importance of ensuring the geogrid is laid perfectly flat, without any 'washboards' or uneven angles, unless a specific engineered design requires such an angle.

Goal: Prepare the ground for a new, higher section of the retaining wall on a steep incline.

Tools and materials

  • Geotextile Grid — Reinforcing the retaining wall
  • Measuring Tape — Ensuring correct dimensions and grid placement
  • Mini-Excavator Bobcat 325 — Digging the base for the retaining wall
  • Shovel — Manual excavation and leveling

What they say

Hide

because alex hurt himself and it wouldn't make a difference if they hurt themselves or not we still tim and i both still get out on the job because it's a way to keep your skills fresh we don't need to be on those jobs but we also don't need to become complacent and lose our skill set and lose an understanding of what it takes to complete a project [Music] so what we got going on over here is we're going to be stepping up we're going to be stepping up really quick because this is where yeah i mean we're working on a hill and it gets real steep up through here so i'm going to get all this based out step ups in and get caught up to course well joey and tim are over there working on that mess of a corner and getting all the base in and stuff over there so then uh hopefully we can get all the all the base or most of the base in by the end of the day and then we can just be building and bag filling for the majority of the day tomorrow but we shall see so got a little bit i need to try to keep at least a little bit in the back of the truck because you know you never know and it's saving us a trip up to the hardware store hopefully it's enough i don't think it's gonna be super low you know so much stuff that blaine picked it up and uh he had kind of topped this off so we bring the mini x out well the mini x has been out but can't figure out when it's low on hydraulic fluid so when you go to fill it up you got to make sure that all of your hydraulics are in an exact certain position otherwise you can't read the level right so what you see joey or sam doing down on the side is there's a little dial and they're eyeballing that dial and as tim's feeling it they're trying to see that fluid come right to the center of that dial [Music] i'm gonna check it [Music] and we're not getting a reading so tim wants to see if it's get draining out or if it's going into the potentially into somewhere where it's not supposed to be going so he wants to make sure that oil is going in just right below it well let's add some more then i just dump the rest of this in here should start seeing it pretty soon coming up on there oh do i got the back thing dropped yep oh in there now seeing it at all oh [Music] now make sure you guys hit that subscribe button because on the very next video coming out tomorrow tomorrow i love you tomorrow it's only a day away i promise to never do that again we're wrapping this job completely up and then we're beginning to dive into our pavers series and…

Auto-generated from the video audio.