Complete Concrete Pour and Curing
At 11:45 in
Off grid solar well pump Day 1: Setup for install
What happens here
After the initial concrete has been poured and mixed, continue adding additional bags of Quikrete into the hole until it is completely filled. Use a tamping post to ensure the concrete settles around the post and angle iron, minimizing air pockets and creating a dense, solid foundation. Confirm the post remains plumb and square with the other post throughout this process. Once both posts are fully secured with concrete, allow the concrete to cure for at least two days before attaching the solar panels. This curing time is crucial for the concrete to reach its maximum strength, creating a foundation that can withstand significant wind loads and prevent post rotation.
Goal: Finalize concrete foundations for posts, allowing adequate curing time.
Tools and materials
- 25-inch Stanley Level Stanley — Re-checking post plumbness during filling
- Measuring Tape — Re-checking post spacing
- Tamping Post — Ensuring dense concrete packing and removing air pockets