Install and Connect the External Plumbing System
At 11:58 in
MOW 142 lawns or install 1 fountain in 3 hours
What happens here
This step involves connecting the prepared urns to a central pump system (which is assumed to be existing for the first urn, but a new one would be needed for a fresh install). PVC pipes are run from the pump to each urn. Control valves are integrated into the piping to allow for individual adjustment of water flow to each urn. The video shows PVC pipes being laid along the pond's edge, connecting the urns and directing water flow. The installer emphasizes the importance of these control valves to balance the water flow, as water naturally seeks the path of least resistance. He notes that if a pump is not already in place, one will be needed along with an electrical outlet to power it.
Goal: Route and connect PVC pipes from the water pump to each urn, incorporating control valves to individually regulate the water flow to achieve the desired fountain effect.
Tools and materials
- Control Valves
- Electric Outlet
- PVC Cement/Primer
- PVC Pipes and Fittings
- Saw
- Water Pump
What they say
(856 characters)Hide
What they say
(856 characters)Auto-generated from the video audio.