Dry-Fit and Assemble Urn Plumbing
At 7:01 in
MOW 142 lawns or install 1 fountain in 3 hours
What happens here
Carefully plan the internal plumbing layout for each individual urn. This involves dry-fitting a main vertical PVC pipe into the base of the urn, ensuring it extends to the desired height for the fountain effect. Connect various PVC fittings, including elbows and T-fittings, along with the control valves, to design a pathway for water from the main supply line up through the urn. Take precise measurements of all pipe sections to be cut. Use a level to ensure that the vertical pipe within the urn is perfectly upright. This dry-fitting stage is crucial for making any necessary adjustments to the pipe lengths and fitting orientations before applying PVC cement and silicone sealant, which permanently bonds the pieces together. The presenter emphasizes that the ability to dial water flow up and down via the valves is important to properly balance the fountains. During this process, you may need to temporarily place the urns in their approximate final positions to accurately route the piping relative to the pond’s contours.
Goal: Plan the internal PVC plumbing for each urn by dry-fitting all components. This allows for precise measurement, cutting, and arrangement of pipes and fittings before making permanent, watertight connections, ensuring proper alignment and optimal water flow.
Tools and materials
- Control Valves
- Decorative Urns
- Level
- Measuring Tape
- PVC Pipes and Fittings
What they say
(2,500 characters)Hide
What they say
(2,500 characters)Auto-generated from the video audio.