Lifting Walls and Initial Bracing
10:00
14:50
435.6K views
At 10:00 in
Learn House Framing and Why it Fails
What happens here
Before lifting walls, create initial clearance by prying up the bottom plate and sliding a 2x4 piece of lumber underneath. This provides crucial leverage and space. Then, carefully lift the framed wall into its upright position. Once the wall is up, install a temporary side brace. This brace should be screwed into the wall and the subfloor/rim joist. The builder explains that the vertical position where the brace is attached to the wall (higher or lower) determines the amount of "kick out" or leverage it provides, allowing for fine adjustments to plumb the wall.
Goal: Safely lift and initially plumb framed walls using bracing
Tools and materials
- 2x4 Lumber — Used as a lever for lifting and for temporary bracing
- Drill/Driver — Screwing in temporary braces to hold the wall
- Framed Wall — The assembled wall section to be lifted into place
- Hammer — Adjusting the plate position and driving fasteners
- Screws — Attaching temporary braces to the wall and subfloor