What happens here

Before lifting walls, create initial clearance by prying up the bottom plate and sliding a 2x4 piece of lumber underneath. This provides crucial leverage and space. Then, carefully lift the framed wall into its upright position. Once the wall is up, install a temporary side brace. This brace should be screwed into the wall and the subfloor/rim joist. The builder explains that the vertical position where the brace is attached to the wall (higher or lower) determines the amount of "kick out" or leverage it provides, allowing for fine adjustments to plumb the wall.

Goal: Safely lift and initially plumb framed walls using bracing

Tools and materials

  • 2x4 Lumber — Used as a lever for lifting and for temporary bracing
  • Drill/Driver — Screwing in temporary braces to hold the wall
  • Framed Wall — The assembled wall section to be lifted into place
  • Hammer — Adjusting the plate position and driving fasteners
  • Screws — Attaching temporary braces to the wall and subfloor

What they say

Hide

plate all the way down. This corner requires proper fastening so it doesn't spread apart because the top plates don't overlap. For a platform framed rake wall, it has overlap top plates and this is what keeps the walls from separating. If you platform frame and install a double top plate, it's easier to install your rake, but doesn't handle lateral forces as well. But platform framing a rake wall can be more forgiving. Roof pitch adds to the height of your structure and determine how low your rafters hang down depending on the size of your overhang. Steeper pitches allow water to flow better, but are harder to walk on, more expensive to have work done. Lower pitch roofs are easier to work on, but can be more of an issue for water and ice dams. For rafters, you'll measure your structure from end to end, then we'll cut that number in half, then subtract half your ridge, typically 3/4. 12 ft is 144 in / 2 gives us 72 in and then we'll subtract 3/4 of an inch and that gives us 71 and 1/4. This number will be our run and we'll do a 7-in pitch and our diagonal will be 82 and 1/2. We'll mark out our pitch, the bottom numbers are common, put down your square, turn up until the top lines up with number seven, make your mark, pull the measurement from our long end, mark 82 and 1/2, draw out another seven pitch. Now rotate your square and use this line to determine your seat