Skip to main content

Attaching Bottom Plate and Studs

0:40
14:50
435.6K views

At 0:40 in

Learn House Framing and Why it Fails

What happens here

After separating the plates, chalk a line 3 1/2 inches back from the edge of the floor (or rim joist) to correctly position the bottom plate. Align the bottom plate with this mark and pin it down with a pneumatic nail gun, driving a nail at an angle into the floor. This angled nailing technique prevents the wall from kicking out when it is stood upright. Then, lay out the studs, ensuring the crown (natural bow) of each stud faces upwards. Finally, nail the bottom plate to the studs, making sure the stud face is flush with the plate.

Goal: Secure the bottom plate to the floor and attach studs

Tools and materials

  • Bottom Plate — Serving as the base of the wall frame
  • Chalk Line — Marking straight lines for plate positioning
  • Hammer — Driving nails
  • Pneumatic Nail Gun Paslode — Fastening lumber quickly and securely
  • Studs — Serving as the vertical framing members of the wall

What they say

Hide

chalk a line 3 and 1/2 in back, line up our bottom plate on our mark, and pin it down at this angle. When these nails get shot in, and this gets rolled over, cuz the bottom of the nail is still in this direction, when this wall gets stood up, it gets locked in from kicking out. If we don't, the bottom can slide out. Lay out your studs crown facing up. Nailing the bottom plate makes it easier when you push in the studs when you go to nail. Flush up the face of the stud and don't nail your hand.

Auto-generated from the video audio.