Installing Openings with Jacks, Headers, and Cripples
At 4:51 in
Learn House Framing and Why it Fails
What happens here
The builder proceeds to install the pre-cut jack studs and headers into a wall frame, emphasizing the crucial need to flush up and securely nail the jack studs to the king studs. He then demonstrates the structural importance of cripple studs, which are short vertical framing members that transfer weight from the top plate down to the header (and from the rough sill plate to the bottom plate). He illustrates that without properly installed cripples, the top plate can flex significantly under load, and roof loads can potentially damage the header or cause structural instability. He shows how installing cripples makes the top plate strong. For efficiency, he advises attaching cripples to the header first before installing the entire header assembly into the wall frame, as this makes nailing much easier and more accurate.
Goal: Securely frame door/window openings with jack studs, headers, and cripples
Tools and materials
- Cripple Studs — Transferring loads between top plates and headers, or from sill plates to bottom plates
- Hammer — Adjusting components and driving nails
- Header — Spanning wall openings to carry loads from above
- Jack Studs — Supporting headers in door and window openings
- Ladder — Providing access to higher sections of the wall during installation
- Pneumatic Nail Gun Paslode — Nailing components securely and efficiently
What they say
(1,717 characters)Hide
What they say
(1,717 characters)Auto-generated from the video audio.