Skip to main content

Planning and Initial Preparation for Wall 2

1:36
21:08
50.2K views

At 1:36 in

I'm done....

What happens here

A second worker (Sammy) joins the presenter, discussing the cold weather. They then focus on the area for the second retaining wall, which will be built as a planter box. Sammy mentions the need for a 6-foot concrete pad and rough excavation for the concrete sub-base, leaving about 4 inches for the concrete pour. He jokes about having cracked ribs, implying heavy physical work involved. The workers highlight that the construction process will be similar to the first wall.

Goal: Two workers discuss the plans for the second retaining wall, including its dimensions and the need for excavation to prepare a concrete pad for the structure.

Tools and materials

  • Notebook
  • Concrete

What they say

Hide

out here you want 6 ft you want 6 ft now and uh when I had it in my notebook it was 6 ft off the corner of that but now 6 ft off the corner of the garage right there so that'll be a pretty good pad for him then he cracked a rib so we're going to leave a we're going to rough excavate this out for the concrete Forum so we'll leave like 4 in and get the piss kind of close and stuff like that so we just has to worry those ribs suck man c a few of mine back in the day and went in cuz it was like I was worried one was going to you know pop through my lungs or something like that and they looked and they're like now you cracked a couple of ribs that sucks I mean they can't do anything about no it's the one bone they cannot do anything for you know they gave me they W I got a compression brand though I keep it tight and it was a little bit better but not much so I'm feeling for this dude man oh God yeah yep we got this one done we're going to get this pad and roughed in and then build our wall the rest of that way yeah and then eventually we'll be doing caps here so this one should be pretty easy it's just going to be a whole lot of Step ups there's going to be like four step UPS in there doing my math right four step UPS in what 20 ft 30 ft 50 50 ft Maybe like 15 you know get a lot of Step Up we've done it before yeah but then we'll probably have you that's what we're doing so far and then we'll get to it

Auto-generated from the video audio.