Setting Up Transfer Equipment
8:35
24:03
13.8K views
At 8:35 in
I wish I did this 20 years ago!
What happens here
Before filling the truck, connect the necessary hoses and valves at the mixing station. This involves attaching a hose from an IBC tote containing Turbo Melt additive to a Milwaukee transfer pump, and another larger hose from the main brine storage tank to the truck's VSI system. The crew discusses utilizing either the truck's VSI pump or an auxiliary pump for efficient transfer, with the shop's system offering faster transfer rates.
Goal: Connect all necessary hoses and pumps for transferring brine and additive.
Tools and materials
- Hoses — Transferring brine and additive
- Milwaukee Transfer Pump Milwaukee — Pumping additive from IBC totes
- Valves and Fittings — Controlling the flow of liquids
- IBC Tote — Containing the Turbo Melt additive
- Main Brine Storage Tank — Containing the bulk brine solution
What they say
(461 characters)Hide
What they say
(461 characters)Auto-generated from the video audio.