Site Preparation: Excavation and Formwork
At 0:49 in
I DON'T TRUST COLLEGES!
What happens here
Begin by using shovels to excavate the existing black soil from the designated area. The narrator emphasizes the importance of a solid sub-base, stating that the concrete's integrity relies entirely on the ground beneath it. Once the unsuitable soil is removed, proceed to construct and install the wooden forms. These forms, typically made from lumber, are positioned to create the desired perimeter of the slab and are secured with wooden stakes driven into the ground. Screws are used to attach the forms to the stakes, ensuring they remain stable during the concrete pour. A tape measure and spirit level are critical here to maintain accurate dimensions and ensure the forms are perfectly level.
Goal: This initial step involves manually digging out and removing the existing organic topsoil to prepare a stable sub-base. Afterward, wooden forms are meticulously set up and secured around the perimeter to define the precise shape and thickness (6 inches) of the concrete slab.
Tools and materials
- Hammer/Drill
- Rakes
- Shovels
- Spirit Level
- Tape Measure
- Wooden Boards
- Wooden Stakes
What they say
(1,649 characters)Hide
What they say
(1,649 characters)Auto-generated from the video audio.